How to Select a Workover Rig

We size a workover rig by the heaviest string it has to pull, not by the depth printed on the well file. The rest of the specification follows from that single lift.

Work out the heaviest single lift first. For 2 7/8 inch tubing at 6.5 kg/m in a 3,000 m well the string weighs about 195 kN dry; with fluid inside and a 30 percent overpull margin the rig needs roughly 260 kN of hook load. The same well with 3 1/2 inch tubing at 9.2 kg/m moves the requirement to about 360 kN. Depth alone tells you nothing until the tubing size is fixed.

Mast height is a separate constraint. A 1,000 kN class rig normally carries a 24 to 29 m mast, which handles a single joint of Range 2 tubing plus the block and hook. If the programme uses Range 3 joints or stands doubles, the mast has to be taller or the joint has to be broken out on the floor. Both add time to every connection.

Selection

What decides the unit

Numbers

Typical duties by hook load

Hook load, kNTypical depth, 2 7/8 tubingMobilityUse
900up to 2,000 mtruck or trailerbeam pump wells, rod work
1,3502,000 - 2,800 mtruckroutine workover, zone change
1,8002,800 - 3,500 mtruck or self-propelledrecompletion, gravel pack
2,2503,500 - 4,500 mself-propelleddeep workover, milling, fishing
3,000 and above4,500 m and deeperplatform or skidoffshore and deep land workover

Offshore, deck area replaces mobility. A platform workover rig of the same hook load class has a smaller footprint, a shorter mast and a skid-mounted substructure, and it has to be lifted as modules that fit the crane chart. The offshore workover unit we build covers that case; the derrick and substructure are broken into liftable packages rather than shipped assembled.

Two checks before we place the order: confirm the BOP and wellhead pressure class against the well, and confirm the travelling block and hook are rated for the same load as the mast. Mixing a 2,250 kN mast with a 1,800 kN block is the most common specification error on a rebuilt unit.

Equipment

Lines this guide points to

Questions we get

Questions buyers ask

Is a 1,350 kN rig enough for 3,000 m of 2 7/8 tubing?

Yes, and we would quote it with margin. The dry string is about 195 kN, and a 1,350 kN unit leaves room for fluid, overpull and stuck-pipe recovery. The limit appears when the string is 3 1/2 inch or when the well is deeper than 3,500 m.

Truck-mounted or trailer-mounted?

Truck-mounted for multi-well programmes with road moves every few weeks; trailer-mounted when the unit stays on one location and a prime mover is already on site. The trailer version costs less to hold and more to move.

Does the rig need a BOP stack?

Any workover that opens the well needs one, and the stack rating has to match the wellhead. A rig sold without a stack is a completion unit and is normally quoted with the pressure control package separately.

What mast height should I ask for?

24 m for Range 2 joints with a single stand, 29 m where doubles are handled or where a top drive is fitted. The height is set by the joint and the block, not by the hook load.

Related reading

Send the duty and we will confirm the model

We size a workover rig by the heaviest string it has to pull, not by the depth printed on the well file. The rest of the specification follows from…

Request a Quote →
BOMCO
Request a Quote