Every repair decision is a trade between downtime and cost, and the right answer depends on whether a spare unit exists.
Fluid end work is the most common job: liners, pistons, valves and seats, and the valve cover and stuffing box that decide how often the rest is touched. A rebuild in the workshop includes checking the fluid end bores for washout and the crosshead for play, because replacing wearing parts in a worn housing just moves the failure forward a few hundred hours.
Engine work splits into top-end and major. Top-end covers heads, injectors, turbocharger cartridges and valve train; a major adds liners, pistons, bearings and crankshaft inspection. The 190 series shares liners, pistons and valve train across land and marine builds, which is what allows a fleet to hold one spares set and exchange units rather than rebuild on site.
BOP work is a recertification exercise as much as a repair: strip, inspect the sealing elements and the ram blocks, replace what is outside tolerance, reassemble, function test and record. The record is the deliverable, because the contractor needs it before the stack goes back on a well.
Where downtime matters more than the repair cost, an exchange unit shortens the outage: the failed unit goes to the workshop, a tested unit goes on the well, and the repair is settled afterwards. The same exchange logic covers a drawworks: the failed unit goes to the workshop while a tested one takes the load.
We strip the unit before we quote the rebuild, because a washed-out bore changes the scope and the price. Our workshop records clearances against the drawing, we test before we return the unit, and we state the cause in the report.
Field repair when transport would add weeks and the work is within the crew's capability; workshop when the unit needs machining, measurement or a test bench. The decision is usually made on the failure description before anyone travels.
For common models, yes, subject to stock at the time of enquiry. The exchange unit is tested before shipment and the failed unit is settled after inspection.
Strip report, replaced parts list, function test record and the reassembly sign-off. The contractor needs all four before the stack returns to a well.