The same equipment catalogue answers five quite different operating problems. What changes is the configuration, the transport constraint and the service model a drilling rig manufacturer has to put behind it.

Application 01

Onshore drilling

On a land drilling rig, transport decides the package before the well does. For development drilling the decision is usually between a mechanical rig with low fuel cost and an AC VFD rig with faster moves and automatic drilling. Pads with more than six wells normally justify a walking substructure and a VFD drive; single wells in remote areas usually favour a truck-mounted rig that travels as one vehicle. BOMCO builds both configurations from the same mast and substructure range, so the transport decision stays a specification question rather than a change of supplier.

Typical package: mast, substructure, drawworks, rotary or top drive, three mud pumps, four-stage solids control, BOP stack and control unit, driller's cabin.

VFD land drilling rig on location
A VFD land rig on location. We match mast, substructure and drawworks at the works, so the rig-up sequence is one drawing, not three.
Application 02

Offshore

Deck area and crane capacity decide the design before pressure and depth do. BOMCO's platform module uses a bottleneck tower or telescoping mast and a four-direction walking system, so the rig moves between slots without a skidding contractor. The HXJ158 workover rig mounts on the main deck and travels along the cantilever to the well slot.

Typical package: mast, walking substructure, DC or AC VFD drawworks, top drive, pump skid, BOP and control unit with nitrogen backup, HSE equipment to the platform's safety case.

Offshore platform drilling module
A platform module. We size the rig floor, drawworks and mud handling around deck area and crane capacity rather than around depth.
Application 03

Workover and well service

Workover economics are dominated by move time and rig-up time. A self-propelled rig at 900 to 2,250 kN hook load with a telescoping mast covers most land workovers, and a coiled tubing unit covers the jobs that are circulation-based rather than pipe-based: sand cleanout, scale, milling and killing. BOMCO builds both units on the same transport envelope.

Typical package: workover rig with mast and substructure, coiled tubing unit with injector and BOP stack, cementing unit and bulk cement truck, pressure control for live-well work.

Self-propelled workover rig
Self-propelled workover rig. We quote the move and the rig-up with the package, because they decide the day rate long before hook load does.
Application 04

Artificial lift

Beam lift remains the default for onshore production, and the operating cost sits in the gearbox rating and the electricity bill. Bent-beam geometry flattens the torque curve so a smaller gearbox and motor do the same lift, and the CJT high-slip drive follows the crank cycle instead of fighting it.

Typical package: pumping unit, high-slip motor and control panel, wellhead and tree, plus spares for the beam bearing and gearbox.

Beam pumping unit in service
A beam unit in service. We choose the gearbox rating and the structure from the rod string and the stroke, not from the motor nameplate.
Application 05

Pressure and stimulation support

High-pressure work needs a closure that operates when the pumps are running and a flow path that holds rated pressure without leaking at the joint. Our pressure control range — the part of the business where an oilfield equipment supplier is judged fastest — covers annular, ram and rotating preventers, control units to API 16D, and wellhead assemblies with sour-service trim.

Fracturing pump packages are manufactured at group level and quoted case by case rather than held as a catalogue line; BOMCO prices them from the treatment programme, so tell us the pressure and rate and the package is configured against it.

Coiled tubing unit on site
A coiled tubing unit on site — the surface end of stimulation and workover work, where we supply the closure and the flow path as one package.
Applications by operation

12 operations, scoped from the well programme

Drilling, workover, artificial lift, cementing, seismic, refining, power, sour service, water injection, OCTG and pad campaigns. Every package is built by BOMCO at Baoji: drilling rig and workover rig spreads, mud pump and pressure control, pumping units, downhole lift and power generation.

Onshore Drilling

Onshore Drilling

Applications · Onshore

Offshore Operations

Offshore Operations

Applications · Offshore

Workover and Well Service

Workover and Well Service

Applications · Well Service

Artificial Lift Selection

Artificial Lift Selection

Applications · Artificial Lift

Cementing and Stimulation

Cementing and Stimulation

Applications · Cementing

Seismic Exploration

Seismic Exploration

Applications · Seismic

Refining and Petrochemical

Refining and Petrochemical

Applications · Refining

Power Generation

Power Generation

Applications · Power

Sour Service and High Pressure

Sour Service and High Pressure

Applications · Well Control

Water Injection and EOR

Water Injection and EOR

Applications · Enhanced Recovery

OCTG and Completions

OCTG and Completions

Applications · Tubular

Pad Drilling

Pad Drilling

Applications · Pad Drilling

Talk to the team that commissions the equipment

Describe the wells you are drilling, and we will propose the package rather than the model.

Request a Quote →
BOMCO
Request a Quote