BOMCO supplies complete drilling equipment packages: land and offshore rigs, drawworks, mud pumps, top drives, masts and solids control.
We build drilling equipment as a complete package rather than a parts list: the rig, the hoisting system, the fluid end and the solids control that keeps the whole circuit running. Output runs to about 100 rigs and 800 mud pumps a year, and the same workshops supply land operators in Shanxi and Xinjiang as well as desert and offshore contracts in the Middle East, North Africa and Central Asia.
Rig sizes cover 1,000 m truck-mounted units for water and shallow oil wells up to 12,000 m AC variable-frequency-drive rigs for ultra-deep gas. Between those ends sit mechanical rigs to 7,000 m, DC electric rigs with SCR transmission, and slant rigs for pad drilling under towns, swamp and beach terrain. Every rig family shares the same control philosophy — PLC logic, integrated drilling instrumentation and a driller's cabin that puts air, electric and hydraulic control on one panel.
The component range behind those rigs is deliberately wide, because a rig is only as good as its weakest link. Masts run from A-frame and K-type to telescoping, tower and jackknife designs at roughly 70,000 tonnes a year; substructures include box-on-box, skid, walking and parallelogram types at about 100,000 tonnes. Drawworks, crown blocks, traveling blocks, swivels and rotary tables are built in the same plant, so our spares list stays valid years after delivery and a replacement sheave still fits the block it was made for.
We quote a rig as a package with a drawing schedule, so the mast, substructure, drawworks and pump skids arrive with interfaces already agreed between them.

Drilling Rigs

Drilling Rigs

Drilling Rigs

Drilling Rigs

Drilling Rigs

Rig Components

Rig Components

Rig Components

Rig Components

Rig Components

Rig Components

Rig Components

Rig Components

Rig Components

Mud Pumps

Mud Pumps

Mud Pumps

Mud Pumps

Solids Control

Solids Control

Solids Control

Solids Control

Solids Control

Solids Control

Solids Control

Drilling Tools

Drilling Tools

Drilling Tools

Drilling Tools

Testing & Commissioning
A truck-mounted or mechanical rig handles that depth at the lowest moving cost. If the pad has more than six wells, a walking substructure with an AC VFD drive pays back the extra capital through faster rig moves.
Yes. Offshore and desert contracts usually take the rig in modules — mast, substructure, drawworks skid, mud pump skid and control cabin — because the modules travel on standard trailers and are assembled on site with the rig's own winch.
Masts and substructures follow API 4F; traveling blocks, hooks and crown blocks follow API 8A and 8C; rotary tables and swivels follow API 7K. BOMCO holds the API monogram for 57 product types across 16 categories.
Standard land configurations run 6 to 9 months from drawing approval, depending on the drive type and whether a top drive is included. Desert fast-move packages are assembled and tested as a unit before shipment.
We size the rig against your hole programme and casing loads first, then fit the drawworks, mast and drive train around that. Send the well plan and we will quote a configuration, not a catalogue number.
A rig quotation starts with five inputs: the depth and casing scheme, the mud weight and programme, the power available on site, the transport corridor, and how often the rig moves. We ask for all five before we size anything, because a mast that suits a 3,000 m well on grid power is the wrong mast for a 3,000 m well reached by a single-track road.
The API standards then decide the hardware rather than the brochure: API 4F governs the mast and substructure load paths, API 7K the rotary and swivel equipment, API 8C the blocks and hooks, API 16A and 16D the pressure control, and API 7K again for the drilling tools below the rotary table. Our drawings are issued against those clauses, so a third-party reviewer can check the design without translating our house style.
Spares planning belongs in the same conversation. We keep the drawing schedule for every rig we ship, which is how our spares desk still locates a part for a drawworks delivered a decade ago, and why a replacement sheave matches the block it was originally fitted to.