Field Service and Commissioning

A package arrives as crates. What decides whether it runs is who is standing on the location when the last bolt is tightened.

Commissioning is a checklist before it is a visit: module weights and lift points, alignment of the drive train, hydraulic and pneumatic schematics, control logic against the function list, and the pressure test on the fluid end. The engineer who signs that sheet is the one who has to answer for the first well.

Our field engineers travel from the Baoji works or from the regional service centres in the UAE, Kuwait, Oman, Saudi Arabia and Egypt, depending on where the equipment is going and how quickly it has to be there. For a first-of-type package the engineer stays through spud and the first connection, because the issues that appear in the first 24 hours are usually interface issues rather than equipment faults.

The visit is documented: commissioning report, as-found and as-left readings, punch list, and the settings recorded for the next crew. That file is what makes the second unit faster to commission than the first.

We send the engineer who commissioned the package back for the first service visit, because he knows which settings were left where. Our reports record as-found and as-left readings, we brief the operating crew at handover, and we keep the file open for the next visit.

How it works

From enquiry to handover

  • Before shipmentDrawings, foundation plan and utility requirements issued so civils and power are ready when the crates arrive.
  • On arrivalJoint inspection against the packing list, damage report, and a rig-up sequence agreed with the site team.
  • CommissioningFunction test of every circuit, pressure test of the fluid end, calibration of instrumentation.
  • HandoverOperator briefing, spare parts handover against the recommended list, signed commissioning report.
Questions we get

Questions we get

Does commissioning cost extra on a standard rig?

It depends on the contract scope. Most packages are quoted with a fixed number of commissioning days plus a day rate beyond that, so the budget is known before mobilisation.

How quickly can an engineer reach a Gulf location?

From the regional service centres the usual route is a commercial flight plus road transfer; the exact window is agreed when the visit is scheduled, because visa and site-access paperwork often set the pace rather than travel.

Is remote support available?

For control and instrumentation issues, yes: the control logic and settings can be reviewed from drawings and logs. Mechanical work still needs someone on the floor.