Drilling, workover and well service equipment · Baoji, Shanxi, China
info@bomcochina.com Service centres: UAE · Kuwait · Oman · Saudi Arabia · Egypt
Applications · Well Control

Sour Service and High-Pressure Well Control

A preventer stack is judged on one question only: whether it closes, holds and opens when the crew calls for it. Everything specified around that question is where a well-control package is won or lost.

The package is built in two halves. The closure side covers annular and ram preventers, rotating preventers for underbalanced work and diverters for shallow formations. Annular preventers come in three body styles (A1, A2 and D), each with a different seal geometry for the pressure and tool-joint range involved; ram preventers come in four variants — RSC, RSF, RSL and RSH — covering single, double and triple stacks. The rotating preventer XF35 handles underbalanced drilling with two-stage rubber sealing, a quick-assembly stuffing box, pressure-lubricated bearings and a cylinder-controlled hub.

The control side decides how fast and how reliably the rams move. We build accumulators, manifolds and panels to API 16D, with dual power sources and nitrogen backup sized so a bottle failure costs no more than 25 percent of usable volume.

Sour service adds the materials question. Wellhead assemblies for H2S duty are built with NACE-compliant trim, and material certificates are issued with the unit rather than requested afterwards. A 7-1/16 in, 70 MPa stack covers most development wells; exploration wells in high-pressure zones often move to 11 in, which changes the stack, the BOP cart and the lift plan together.

Every stack is function tested before shipment, with the test record in the documentation pack. That record is what the drilling contractor hands to the operator at spud, and what the auditor asks for at the end of the well.

We test every stack and record the result before it is packed, because the contractor needs the sheet at spud. Our engineers review the maximum anticipated surface pressure with the operator, we issue the material certificates with the unit, and we witness the first function test on site. Sour service work is quoted with the material certificates, since the auditor asks for them before the stack is signed off.

High-pressure injection pump packaged for sour service
A high-pressure injection pump packaged for sour service.
What decides the outcome

Where it fits and what to check

  • Annular BOPA1, A2 and D body styles, conical or spherical sealing elements chosen against the tool-joint range.
  • Ram BOPRSC, RSF, RSL and RSH rams in single, double and triple configurations, with the model code reading type, bore and pressure class.
  • Rotating BOPXF35 for underbalanced drilling: two-stage seal, modular rotor and hub, pressure-lubricated bearings.
  • Control systemAPI 16D, dual power sources, nitrogen backup, 25 percent maximum usable-volume loss on bottle failure.
  • WellheadsConventional, KYS series, ESP, high-pressure anti-corrosion and thermal wellheads to API 6A.
  • Sour serviceNACE-compliant trim and material certificates issued with the unit, not on request after delivery.
Questions we get

Selection notes

How is preventer size and pressure class chosen for sour service?

From the maximum anticipated surface pressure and the largest tool that has to pass through the stack. A 7-1/16 in, 70 MPa assembly covers most development wells; exploration wells in high-pressure zones often move to 11 in, which changes the cart and the lift plan with it.

Is sour service covered on the wellhead as well as the BOP?

Yes. Wellhead assemblies for H2S duty are built with NACE-compliant trim, and the material certificates travel with the unit so the drilling programme can show traceability at audit.

Equipment

Lines that carry this operation

High Pressure Flow Control carries the main duty, Drilling Equipment covers the pressure side, and we quote the three as one scope where they meet on a location.

Related applications and services

Quote this application against your well programme

A preventer stack is judged on one question only: whether it closes, holds and opens when the crew calls for it. Everything specified around that…

Request a Quote →
BOMCO
Request a Quote