Drilling, workover and well service equipment · Baoji, Shanxi, China
info@bomcochina.com Service centres: UAE · Kuwait · Oman · Saudi Arabia · Egypt
Applications · Onshore

Onshore Drilling Packages for Development and Exploration Wells

Land programmes are decided by two numbers before the first well is spudded: how many days the rig takes to move, and how many hours the fluid end runs between failures.

A 3,000 m development well on a multi-well pad spends more time being moved than being drilled if the rig is the wrong shape. That is why the package is specified backwards from the programme: number of wells, spacing, road limits between locations, and the deepest interval that has to be drilled in one run.

The onshore drilling range covers 1,000 m truck-mounted units for water and shallow oil wells, mechanical rigs to about 7,000 m, DC electric rigs with SCR transmission, AC variable-frequency-drive rigs to 12,000 m for ultra-deep gas, and slant rigs for pads under towns, swamp and beach terrain. Output runs to about 100 rigs and 800 mud pumps a year from the same workshops that supply desert and offshore contracts in the Middle East, North Africa and Central Asia.

A rig is only as good as the parts around it, so the quotation normally covers the hoisting system, the fluid end, the solids control circuit and the drill string as one scope. Modules are weighed and dimensioned for the transport permits on the road between locations, which is a design input rather than a shipping detail.

We build the rig, the mast and the fluid end in the same works, so we can hold the interface to one drawing set. Our engineers set the rating point at commissioning against your fuel and altitude, we hand over the signed test sheet with the unit, and we keep the drawings current for its working life. Onshore drilling packages for desert and mountain work share the same mast and pump modules, which is why we keep one spares set across both.

Truck-mounted drilling rig standing on a desert location
A truck-mounted rig on a desert location, built for short moves between wells.
Trailer-mounted drilling rig with mast raised
A trailer rig with the mast raised, working a desert location.
What decides the outcome

Where it fits and what to check

  • Onshore drilling rig selectionTruck-mounted units suit single shallow wells; a walking substructure with AC VFD drive pays back on pads above six wells, where rig-move days dominate the spread cost.
  • HoistingDrawworks from 280 to 6,000 HP, masts and substructures to API 4F, traveling blocks and hooks to API 8A and 8C, supplied as a matched set so sheaves and bearings interchange.
  • Fluid endF-series triplex pumps and the five-cylinder QDP-3000 to 34.5 MPa, sized against hole diameter, pump rate and the penetration rate the programme expects.
  • Solids controlShakers, centrifuges, degassers, agitators and shear pumps sized to the circulation rate rather than to the rig's nominal rating, which is where most mud circuits are lost.
  • Power190 series diesels from 110 to 2,400 kW, dual-fuel or gas where the field has associated gas, or grid electric drive where the pad has a supply.
  • Drill stringDrill pipe to API 5D in E75, X95, G105 and S135, collars to API 7, jars, shock absorbers and PD motors matched to the bottom-hole assembly.
Questions we get

Selection notes

How deep can a truck-mounted onshore drilling rig realistically go?

Most truck-mounted work sits between 1,000 and 3,000 m. Beyond that the mast height, substructure capacity and pump size push the programme towards a mechanical or electric rig, and the move to a pad layout usually comes at the same time.

When is AC VFD worth the extra capital over SCR?

On pad drilling, long laterals and wells where weight on bit has to be held precisely. The drive holds torque at low speed, which keeps the bit loaded through connections, and the smaller footprint matters when the substructure has to walk between well slots.

Can the mud pumps be quoted separately from the rig?

Yes. Many customers take the rig from one supplier and the fluid end from another, so pumps, skids and control are quoted as a standalone package with its own datasheet and test record.

Equipment

Lines that carry this operation

Drilling Equipment carries the main duty, High Pressure Flow Control covers the pressure side, and we quote the three as one scope where they meet on a location.

Related applications and services

Quote this application against your well programme

Land programmes are decided by two numbers before the first well is spudded: how many days the rig takes to move, and how many hours the fluid end…

Request a Quote →
BOMCO
Request a Quote