Export Packing, Shipping and Documentation

A rig package is only delivered when it arrives complete, undamaged and with the paperwork the customs broker needs on the same day as the cargo.

Packing is designed against the transport mode and the route, not against the crate that happens to be in stock. Modules are braced and skidded for sea freight, machined surfaces are protected against condensation, and loose parts are labelled to the assembly position so the rig-up does not stall on a missing bolt box.

Heavy and out-of-gauge items are planned before the ship is booked: lift points, centre of gravity, cribbing and the crane capacity at both ends of the route. That planning is what prevents a module sitting on a quay while a second crane is sourced. A PSV or AHTS offshore support vessel takes the same planning one level up: the module has to fit the deck and the crane before it fits the quay.

Documentation is issued as a pack rather than one document at a time: packing list by case, commercial invoice, certificate of origin, mill certificates, test records and the fumigation or treatment certificate where the destination requires it.

For tubulars, the loading pattern matters as much as the packing: pipe is stacked and braced to protect the ends and the coating, and the stow plan is issued to the stevedore before the vessel arrives. A seismic crew vehicle travels the same way: the recording box is packed against vibration rather than against weight, because a loose connector costs a day of acquisition.

We photograph the crate before it is closed, and we issue the documentation pack as one set rather than one document at a time. Our packing is designed against the route, we check the lift points with the carrier, and we track the consignment to site.

Drilling rigs and modules assembled in the yard
Rigs and modules assembled in the yard before shipment.
Drilling rig module being lifted onto transport
A rig module lifted onto transport at the yard.
How it works

From enquiry to handover

  • PlanRoute, mode and the heavy or out-of-gauge items identified from the packing list.
  • PackCrates built and braced, parts labelled, photographs taken before closing.
  • DocumentExport pack assembled and checked against the destination's requirements.
  • ShipBooking, stow plan and tracking, with the arrival documents issued ahead of the vessel.
Questions we get

Questions we get

Can out-of-gauge modules be shipped in containers?

Sometimes, after partial disassembly, but the decision is made on the module dimensions and the route rather than on convenience. Where break-bulk is cheaper, the quotation says so.

Who prepares the certificate of origin?

We issue it as part of the documentation pack. The form and the chamber of commerce route depend on the destination and are confirmed at order.

Are packing photographs available?

Yes. Photographs are taken before the crate is closed, which is also the evidence used if a damage claim is opened.

Scope in detail

What the service includes

Other services and where they are used