Drilling, workover and well service equipment · Baoji, Shanxi, China
info@bomcochina.com Service centres: UAE · Kuwait · Oman · Saudi Arabia · Egypt
Service · Inspection

Inspection, Testing and Certification

The certificate matters as much as the equipment, because the equipment does not go on the well until the file is closed.

Testing is scheduled against the delivery date rather than after it. Function tests on preventer stacks, pressure tests on the fluid end and non-destructive examination on load-carrying parts all produce records that travel with the unit: test pressure, hold time, instrument number, witness signature. Rotating equipment is tested the same way before it ships: on a flue gas expander the overspeed trip, the vibration signature and the rotor record all go into that pack.

Where the contract requires a third-party witness, the inspection is coordinated rather than left to the customer: the inspector is booked against the test date, the drawings and procedure are issued in advance, and the punch list is closed before shipment instead of on site.

The company holds the API monogram for 57 product types across 16 categories, and the monogram is applied where the specification calls for it. That is a manufacturing claim, not a marketing line, and it is checked against the scope at quotation.

For sour service, the material certificates and the NACE-compliant trim are part of the same pack, so the operator can show traceability from heat number to installed component. For sour wells the same traceability covers the drilling jar: the mandrel and the seal are certified to the NACE requirement and the heat number is on the record.

We book the third-party inspector against the test date and issue the procedure in advance, so the witness visit is a verification rather than a discovery. Our records name the instrument, the hold time and the witness, we close the punch list before shipment, and we keep the certificates with the shipment.

High-pressure testing manifold on a test pad
A testing manifold used for pressure and function tests.
How it works

From enquiry to handover

  • ScopeStandards, acceptance levels and witness requirements fixed at enquiry, before the drawing is released.
  • ProcedureTest and inspection procedure issued to the customer or the third party for review.
  • ExecutionTest performed on the scheduled date, witnessed where required, readings recorded as found.
  • PackRecords, certificates and traceability documents issued with the shipment.
Questions we get

Questions we get

Can a third-party inspector be arranged?

Yes. The inspector is booked against the test date and the drawings and procedure are issued in advance, so the witness visit is a verification rather than a discovery.

What does the API monogram cover?

It is applied where the specification calls for it, across 57 product types in 16 categories. The exact scope for a given item is confirmed at quotation rather than assumed from the product name.

Are test records supplied in English?

Yes, and the units and acceptance criteria follow the standard named on the order, so the record can be read against the same document the operator is using.

Scope in detail

What the service includes

Other services and where they are used

Put a name to the service desk before you need it

Request a Quote →
BOMCO
Request a Quote