Drilling, workover and well service equipment · Baoji, Shanxi, China
info@bomcochina.com Service centres: UAE · Kuwait · Oman · Saudi Arabia · Egypt
Applications · Offshore

Offshore Drilling Modules and Jack-Up Packages

Offshore work is decided by deck area before it is decided by horsepower: the crane envelope is fixed, the hatch is fixed, and the module has to pass through both.

That constraint shapes the package. A 7,000 m DC electric rig module is laid out so it can be assembled, operated and maintained inside the deck area available, with a bottleneck tower mast or a telescoping mast instead of a conventional guyed structure. Tower masts carry more load in less footprint and need no guy wires, which keeps the crane envelope clear during installation and later maintenance.

Rig movement uses a friction or ratchet walking system that shifts the module in four directions on the deck, so batch drilling from one platform position runs continuously instead of stopping for a skidding contractor. Drawworks driven by twin DC motors hold speed regulation and power factor through each connection, and the brake package combines a high-torque hydraulic disc with electromagnetic eddy-current or disc auxiliary braking.

For workover duty the HXJ158 was developed for platform main-deck installation: 33 m tower mast, no guy wires, cantilever travel to the well slot. The configuration repeats on other platforms with different slot spacing, which is what makes it a product rather than a one-off.

Hull side, the CP series covers bottom-supported, cylindrical-leg and truss-leg jack-ups to a maximum self-elevating water depth of 91.4 m, classed with CCS, ABS or DNV, and takes platform rigs up to a 9,000 m (3,000 hp) rating. Hull and drilling package come from the same works, so the interface between them is one scope rather than two contracts.

We assemble and test the module before it is broken down for shipment, because a deck that will not take the lift cannot be fixed later. Our engineers travel to the platform for the first rig-up, we set the walking sequence with the driller, and we leave the as-built drawings on the platform. We hold that lifting plan for the next campaign, and our engineers review it against the new deck before the module ships.

Jack-up drilling unit working over a platform at dusk
A jack-up unit working over a platform at dusk.
Offshore workover unit standing over a fixed platform
A platform workover unit over a fixed platform.
What decides the outcome

Where it fits and what to check

  • Rig module7,000 m DC electric package, bottleneck tower or telescoping mast, laid out for deck assembly and crane limits.
  • WalkingFriction or ratchet system moving the module in four directions, removing the crane and skidding contractor from the batch sequence.
  • DrawworksTwin DC motors, hydraulic disc main brake plus eddy-current or disc auxiliary brake for precise weight on bit.
  • WorkoverHXJ158 deck-mounted unit, 33 m tower mast, cantilever travel to the slot, no guy wires.
  • HSEWind walls, rain covers, escape devices, anti-fall systems and centralised driller control.
  • HullCP series jack-ups to 91.4 m water depth, CCS / ABS / DNV class, drilling package to 9,000 m.
Questions we get

Selection notes

Why a tower mast instead of a conventional mast?

It carries more load in less deck area and needs no guy wires. On a platform the crane envelope is shared with everything else being lifted, so removing the guys removes a permanent obstruction, not just an installation step.

How does the walking system change the programme?

It moves the module between well slots without a crane or a skidding contractor, so a batch programme runs slot after slot without a break for rigging. That is usually the difference between a platform campaign finishing inside its window or not.

Can a land rig package be adapted for platform duty?

Sometimes, but the enclosure, escape routes, wind walls and brake duty all change. It is normally cheaper to specify the platform module from the start than to convert a land package after the deck layout is fixed.

Equipment

Lines that carry this operation

Offshore Equipment carries the main duty, Jack-Up Drilling Platforms covers the pressure side, and we quote the three as one scope where they meet on a location.

Related applications and services

Quote this application against your well programme

Offshore work is decided by deck area before it is decided by horsepower: the crane envelope is fixed, the hatch is fixed, and the module has to pass…

Request a Quote →
BOMCO
Request a Quote